This project showcased TTG’s expertise in both collaborative design processes and complex historic preservation techniques.
Design Phase
- Collaboration with Lord Aeck Sargent, nationally renowned preservation architects
- Assistance in project development from 95% design to final construction documents
- Participation in final design review, trial sample treatments, and cost reconciliations
Cupola Restoration
- Paint removal from wood and metal surfaces using Sponge-Jet micro-abrasive and chemical removal methods
- Restoration and replication of decorative wood components throughout the structure
- Replacement of copper roof and related flashings
- Fabrication and installation of new ornate copper ribs on the eight roof hips
- Restoration of dormer faces and windows
- Replacement of metal cladding at the cupola base
- Application of a five-coat multi-component epoxy paint system
Scaffolding and Protection
- Design and installation of scaffold system over the existing copper main roof
- Implementation of intensive shoring in the attic to support scaffolding
- Special attention to protecting the existing roof and attic from scaffold impact
The Tradesmen Group demonstrated its exceptional capability in both collaborative design processes and execution of complex restoration projects. As the CMc and Prime Contractor, TTG showcased its comprehensive in-house preservation services and ability to manage multifaceted historic restoration work.
Key aspects of TTG’s role included:
- Active participation in the design process, ensuring constructability and cost-effectiveness
- Execution of diverse restoration techniques for different materials (wood, copper, paint)
- Implementation of specialized cleaning and paint removal methods to preserve historical integrity
- Integration of new elements (copper ribs, metal cladding) with existing historical features
- Design and installation of a complex scaffolding system to protect the existing structure
- Management of a project scope encompassing multiple building elements and preservation techniques
This project underscores TTG’s commitment to preserving America’s architectural heritage through collaborative design approaches and comprehensive restoration techniques. Our successful execution of both the design-assist and construction phases further solidifies TTG’s position as a leader in historic preservation, capable of addressing complex restoration needs while ensuring the longevity and authenticity of significant federal buildings.